Aspire Academy

Expansion of Aspire Academy, Qatar

Image of Canopy 2 from all the 3 canopies
  • Project Type: Expansion of Aspire Academy (football performance centre)
  • Project Scope: BO Roof, LRC Building, Dome Structure, LRC Stair
  • Client Type: Main/Sub Contractor
  • Project Area: NA
  • Location: Qatar
  • Execution Year: 2017
  • Inputs: Consultant IFC Drawings
  • LOD: 300, structural detailed design and drawings and connection design
  • Deliverables: Structural analysis and preparation of calculation Report, Shop drawings, fabrication drawings (parts), assembly drawings, erection mark drawings, as built drawings, detailed design of connections and their approvals
  • Software: Tekla, Autocad, Staad Pro, Limcon, Procon, Hilti etc.
  • Services: Detailed structural drawing and connection design
  • Team Size: 1 project manager, 5 detailers, 1 checker

Project Brief Description

For the expansion of Aspire Academy, the football performance center in Qatar, the main/sub contractor contacted us for detailed structural drawings and connection design. The project scope was for BO Roof, LRC Building, Dome Structure, LRC Stair. For this project, the input from the client were consultant IFC drawings. With this input, we delivered structural analysis and preparation of calculation Reports, Shop drawings, fabrication drawings (parts), assembly drawings, erection mark drawings, as-built drawings, detailed design of connections and their approvals. For this project, we provided one project manager, five detailers and one checker to our client. The software used for the purpose were Tekla, Autocad, Staad Pro, Limcon, Procon, Hilti etc. The project was successfully executed in the year 2017.

BO Roof

full view of canopy 1

BO Roof Image

...

BO Roof Image

...

BO Roof Image

...

BO Roof Image

...

BO Roof Image

...

BO Roof Image

FPC Dome Structure

...

FPC Dome Structure Image

...

FPC Dome Structure Image

...

FPC Dome Structure Image

...

FPC Dome Structure Image

Our Similiar Projects

...

Al Badar Canopies

The project scope was for 3 canopies from Selwa Resort Project (5 Star), Qatar. The inputs for the projects were architectural drawings and concept sketch.

...

Arcon Assembly Halls

The project scope was for 3 halls for Arcon School Assembly Hall. The inputs for the projects were architectural drawings and concept sketch.

...

Aspire Academy

The project scope was for BO Roof, LRC Building, Dome Structure, LRC Stair for Aspire Academy (Football Performance Centre)

...

Fahed Club House

The project scope was for the clubhouse roof for Fahed Club House. The inputs from the clients were architectural drawings and concept sketch.

...

Katara Children's Mall

The project scope was for a children's mall in Katara, Qatar. The inputs from the client for the project were architectural drawings and concept sketch.

...

Redco Shopping Mall

The project scope was for a shopping mall for Redco. The inputs from the client for the project were architectural drawings and concept sketch.

...

SEF Banquet Hall

The project scope was for a commercial space, banquet hall for a 5 star hotel. The inputs for the projects were architectural drawings and concept sketch.